Spectrum & PolicyFcc45 Mhz BandDrone DetectionAdvanced Air Mobility

FCC votes to open 45 MHz band and expand drone detection

The FCC voted to open the 45-MHz band to safety data links and authorize 24.45–24.65 GHz radar for drone detection, alongside nationwide licensing for drones and advanced air mobility.

3 min read

FCC Modernizes Drone Communications, Detection RulesSpectrum & Policy
FCC Modernizes Drone Communications, Detection RulesValentin Lacoste / unsplash

Why it matters

  • The FCC voted to open the 45-MHz band to safety-related aircraft data links.
  • The 45-MHz band previously carried only voice for high-altitude general aviation.
  • Ground radar may use 24.45–24.65 GHz to detect and track unauthorized or dangerous drones.
  • The radar allocation covers 200 MHz, more than four times the 45-MHz communications band.
  • A nationwide licensing system covers drones and advanced air mobility.

The story

Daniel Okafor

The Federal Communications Commission voted to open the 45-MHz band to safety-related aircraft data links and permit drone-detection radar in the 24.45–24.65 GHz band near critical infrastructure.

The decision also establishes a nationwide licensing system for drones and advanced air mobility. It affects both crewed aircraft and uncrewed systems. No operator, vendor, contract value, subscriber figure, or commercial result accompanies the vote. The decision concerns regulatory permissions, not a demonstrated market rollout.

What changes in the 45 MHz band?

The change replaces site-by-site rules with permission for safety-related data links between ground and aircraft. Both crewed and uncrewed aircraft fall within the new scope. Before the vote, the band supported only voice communications for high-altitude general aviation.

The FCC now updates legacy, site-based general air-ground service rules that previously prohibited data communications. They also barred wide-area, low-altitude service to unmanned aerial systems. Those restrictions give way to a national licensing structure for drones and advanced air mobility.

The FCC deemed the previous site-by-site framework outdated. Operationally, the move expands the permitted use of terrestrial links to aircraft. It does not describe a specific network architecture. No spectrum auction, carrier assignment, or equipment tender appears in the decision. Accordingly, the commercial effect remains prospective rather than demonstrated.

The rules expand permitted services, but provide no throughput, latency, coverage, deployment count, subscriber total, launch date, or implementation timetable for any operator or public-safety agency.

How does the radar rule change?

Ground-based radar may now use the 24.45–24.65 GHz band to detect and track unauthorized or dangerous drones. The authorization covers 200 MHz, based on the span between the stated frequencies. That allocation spans more than four times the width of the 45-MHz communications band.

The rule identifies four named settings and a broader category:

  • Airports
  • Borders
  • Prisons
  • Stadiums
  • Other critical infrastructure

The measure changes regulatory permission, not a demonstrated radar rollout. It does not identify a purchaser, supplier, installation program, or budget. No detection range, tracking accuracy, or performance criteria appear in the decision.

For practitioners, the rule establishes a permissible sensing tool, although it leaves the technical specifications, procurement route, and deployment sequence entirely undefined by the decision.

What does nationwide licensing mean for advanced air mobility?

The nationwide licensing system covers drones and advanced air mobility. Taken together, the provisions replace the prior site-by-site approach for affected aviation communications rules. That changes the authorization basis from individual sites to a national system. The FCC also intends the package to improve in-flight broadband.

No provision names an airline, drone operator, network vendor, or equipment maker. No user numbers, coverage targets, speed tests, or financial commitments accompany the vote. Nor does it announce a commercial service, procurement round, or mandatory installation schedule.

That distinction matters to investors and suppliers. A permission to operate does not itself establish demand, utilization, or revenue. In practice, the decision lowers a regulatory barrier for safety communications and counter-drone sensing, while leaving every commercial timetable, investment amount, and delivery milestone for later specification.

What should practitioners watch next?

The decision sets no date for licensing guidance or implementation. Key implementation questions include license eligibility, permitted equipment, radar procurement, and deployment sequencing. The FCC website will carry further information.

The near-term signal is regulatory, not operational. Further activity depends on agencies and service providers turning the permissions into licensed deployments and fielded radar systems. Until those steps occur, the measurable result is the rule change itself: two spectrum provisions and a nationwide licensing structure.

The package establishes what is permitted, while commercial schedules and public investment remain unspecified. Further commercial activity will depend on agencies and operators converting those permissions into deployments, but no service rollout, procurement, or investment timetable accompanies the decision.

Also reported

Share this article:

« PreviousNext »

More from Daniel Okafor

Daniel Okafor

Show full bio

Senior reporter covering regulation, policy and their impact on Carrier business, 5G and 6G, fiber and broadband at Telecom Gazette.

591 articles