5G & 6GTelefonicaPrivate 5gSlovakiaDefence Communications
Telefónica to build private 5G network for Slovak defence centre
Telefónica will build and maintain a private 5G network for Slovakia’s new military testing centre, with Nokia, XRF and Zebra supplying key components and Telefónica providing three years of support.
5G & 6GWhy it matters
- Telefónica will design, install and maintain a private 5G network at Slovakia’s Controlled Experimentation Centre.
- The centre will conduct NATO-backed trials involving AI, extended reality, secure communications and drone systems.
- Nokia supplies 5G radio equipment, XRF supplies command-and-control systems and Zebra Technologies supplies mobile devices.
- Telefónica will provide three years of technical support, maintenance, software and technology upgrades after launch.
The story
Daniel Okafor
Telefónica will design, install and maintain a private 5G network for Slovakia’s new Controlled Experimentation Centre, then provide three years of technical support and maintenance.
Slovakia’s Ministry of Defence selected Telefónica to deliver the communications network for the centre. Military personnel will use the facility to assess 5G technology in realistic defence conditions under NATO-backed trials.
This is a site-specific private-network procurement, not an announced commercial coverage expansion. The contract gives Telefónica a reference project in the defence sector, where network availability, device performance and interoperability must operate as one managed system.
What will the centre test?
The Controlled Experimentation Centre will assess several technologies in field conditions. The programme covers:
- Artificial intelligence and extended reality.
- Secure communications.
- Drones and systems designed to counter hostile drones.
- New digital capabilities that could support military exercises and field testing.
The centre gives military personnel a controlled environment in which to examine how those technologies perform outside conventional commercial deployments. The announcement does not claim that the trials have already produced operational results.
What is inside Telefónica’s scope?
Telefónica carries responsibility for more than the radio network. Its package includes the private 5G system, a command-and-control system, rugged mobile phones, tablets, 5G SIM cards and other equipment.
That equipment will support military exercises and allow new technologies to be tested in the field. Telefónica will also coordinate its work with the named suppliers responsible for major components of the deployment.
For network suppliers, the structure matters. Telefónica is the named integration contractor for design, installation, testing, maintenance and upgrades, rather than a supplier selling isolated radio or handset products.
Who is supplying the technology?
Telefónica will work alongside Atika, Nokia, XRF and Zebra Technologies. The announcement assigns three specific supply roles:
- Nokia: 5G radio equipment.
- XRF: command-and-control systems.
- Zebra Technologies: mobile devices.
Atika is listed as a delivery partner, but the announcement does not identify its specific work package. Telefónica will still supply the command-and-control system as part of the broader delivery, with XRF named as its supplier.
How long are the obligations?
The delivery programme covers installation, system testing, security checks and staff training. Those activities precede the centre’s operational use by military personnel.
Once the centre begins operating, Telefónica will provide technical support and maintenance for three years. That equals 36 months of post-launch service, including software and technology upgrades.
The announcement does not disclose annual spending, service-level targets or the number of personnel and devices involved. It also provides no launch date, spectrum allocation, 3GPP release or measured throughput target.
Javier López Gutierrez, Telefónica España Director of Defence and Security, said: “The launch of this Controlled Experimentation Centre is highly significant as it will enable us to explore the full potential of 5G technologies and their evolution towards future generations of mobile technology (xG) in real-world defence scenarios.”
He added: “This project will enable us to deliver more and better services by validating new digital capabilities that will accelerate the adoption of innovative solutions by the military, help improve effectiveness, security and interoperability in this field, and strengthen national sovereignty through a key initiative for the defence sector.”
What does the award change for suppliers?
The commercial structure is defined, although operational performance remains untested. Telefónica has secured a multi-part role across network construction, command systems, devices, training and three years of lifecycle support.
López Gutierrez’s comments describe the strategic ambition of the project. The award provides no evidence yet on throughput, coverage area, security certification, interoperability results or the number of military users, so the practical performance of the deployment remains unproven.
The announcement also omits the contract value and equipment quantities. Those omissions limit direct commercial comparisons, while making the three-year support commitment the clearest available measure of Telefónica’s continuing obligation.
NATO backing applies to the trials, not network ownership or procurement. The Slovak ministry selected Telefónica, and the announcement does not identify a separate NATO service contract or broader plan to replicate the private network at other defence sites.
When does the centre open?
The project has no published installation or opening schedule. The immediate delivery sequence is installation, system testing, security checks and staff training, followed by operation of the Controlled Experimentation Centre and its NATO-backed military trials.
The first test results will determine whether the combined network, command system and devices can meet defence requirements. Because no opening date is disclosed, the first firm rollout milestone remains completion of installation and system testing, after which the centre can begin its planned field evaluations.
Also reported
Source: Mobile Europe
More from Daniel Okafor
Show full bio
Senior reporter covering regulation, policy and their impact on Carrier business, 5G and 6G, fiber and broadband at Telecom Gazette.
559 articles