Carriers & OperatorsBelgium2g ShutdownBiptMobile Network Migration

Orange, Proximus and Telenet/BASE to retire Belgium’s 2G by 2029

Belgium’s Orange, Proximus and Telenet/BASE plan to retire 2G in 2028–2029, with BIPT pressing carriers to give residential and business users advance notice.

3 min read

Belgian telcos to retire 2G networks by 2029Carriers & Operators
Belgian telcos to retire 2G networks by 2029Horacio30 / pixabay

Why it matters

  • BIPT announced on November 16 that Belgium’s main operators plan to retire 2G in 2028–2029.
  • Orange, Proximus and Telenet/BASE each confirmed their 2G retirement plans with BIPT.
  • Carriers plan to support 2G users on 4G and 5G while maintaining customer connectivity.
  • UK carriers are pushing to retire 2G by 2033.
  • A GSMA report counted 131 network shutdowns scheduled by 2030, with about half involving 2G.

The story

By James Calloway

Belgium’s main mobile operators plan to retire their 2G networks in 2028–2029, according to a November 16 announcement from the Belgian Institute for Postal Services and Telecommunications (BIPT).

BIPT said Orange, Proximus and Telenet/BASE had confirmed their retirement plans with the regulator. The announcement gave a two-year window. No common switch-off date.

What does this change for 2G users?

Operators will support 2G users onto newer 4G and 5G networks during the switch-off process. BIPT said the carriers had agreed to phase out 2G while ensuring all customers remain supported and connected.

Voice service receives particular attention because shutdowns can complicate access to emergency services. The regulator also referred to other applications, making the transition a continuity issue beyond legacy voice support.

“The BIPT emphasizes the importance of providing sufficient advance notice to both residential and business users to prevent issues with voice communications—particularly regarding access to emergency services—as well as other applications,” BIPT said in its translated statement.

That emphasis makes the transition a service-continuity issue as well as a network upgrade. Operators need to manage customer migration before their 2G service ends, although the post does not define how far in advance notices must appear.

The stated commercial and network logic is straightforward: the shutdown will support each operator’s focus on its respective 4G and 5G networks. The announcement contains no vendor performance claims and no commercial figures. BIPT presents migration and continued connectivity as the immediate customer issue.

For customers, the practical change is the end of 2G-only service and a move to supported 4G or 5G arrangements before the relevant operator completes its shutdown. The announcement does not set out handset replacement programs, pricing or a customer timetable for each operator.

Nor does it explain how emergency calling will be maintained for each operator. That operational detail matters because BIPT specifically linked advance notice with avoiding problems in voice communications and access to emergency services.

How does Belgium compare with other markets?

BIPT placed Belgium’s schedule alongside other network retirements. In the UK, carriers are pushing to end 2G by 2033, later than Belgium’s 2029 endpoint. A GSMA report cited by BIPT counted 131 networks scheduled for shutdown by 2030, with about half involving 2G.

These figures place Belgium within a broader retirement cycle, but they do not make national schedules uniform. The Belgian window covers 2028–2029, the UK example runs to 2033, and the GSMA tally extends across shutdowns through 2030.

The GSMA data nevertheless gives the Belgian decision a wider context: roughly half of the networks due to close by 2030 are 2G networks, the same generation covered by the Belgian retirement announcement.

What has not yet been settled?

The November 16 announcement sets the broad timetable and customer-support commitment, but it is not a complete transition plan. It does not give each operator’s exact shutdown date, subscriber numbers, geographic coverage milestones or technical arrangements for emergency calls. It also gives no device-replacement terms for residential or business users.

BIPT described the process as an operator-agreed phase-out with customer support built in. The post did not describe sanctions for missing the 2028–2029 window, a regulator-led migration schedule or a common national switch-off procedure.

The dates therefore set the planning horizon, while operators still need to sequence customer notices, 2G migrations and shutdown work. BIPT’s stated priority remains continuity for residential and business users as carriers concentrate on 4G and 5G.

How operators sequence their 2028–2029 shutdowns, and how much notice they give residential and business users, will determine whether the phase-out avoids disruption to voice, emergency-service access and other applications.

Also reported

Share this article:

« PreviousNext »

More from James Calloway

James Calloway

Show full bio

Staff writer covering companies, deals and strategy in Carrier business, 5G and 6G, fiber and broadband at Telecom Gazette.

510 articles